Water System Preparation
Please read before using the water system.
Immediately after installation, follow the steps below to make
sure that the water system is properly cleaned.
1. Open the freezer door and turn off the ice maker. Move the
switch to the OFF (right) setting as shown. The ON/OFF
switch is located on the top right side of the freezer
compartment.
NOTES:
If your model has a base grille filter system, make sure the
base grille filter is properly installed and the cap is in the
horizontal position.
Do not use with water that is microbiologically unsafe or
of unknown quality without adequate disinfection before
or after the system. Systems certified for cyst reduction
may be used on disinfected waters that may contain
filterable cysts.
2. Use a sturdy container to depress the water dispenser bar
until the water begins to flow. Flush the water system by
dispensing and discarding 6 qt (5.7 L) of water. Cleaning the
system will take approximately 3 to 4 minutes and will help
clear air from the line. Additional flushing may be required in
some households.
NOTE: As air is cleared from the system, water may spurt out
of the dispenser.
3. Open the freezer door and turn on the ice maker. Move the
switch to the ON (left) position.
Allow 24 hours to produce the first batch of ice.
Discard the first three batches of ice produced.
Depending on your model, you may want to select the
maximum ice feature to increase the production of ice.
26
Complete Installation
1. Turn the water supply line valve to the "Open" position.
2. Turn the refrigerator switch to the ON position. See "Power
On/Off Switch" in the Use & Care Guide for instructions. Wait
a few minutes. Check the water line connections for leaks.
3. Remove all boxes, parts packages and packing materials
from the interior of the refrigerator. See the "Cleaning" section
in the Use & Care Guide for instructions. Remove the
protective film and cardboard from the grille and doors or
door frame, depending on your model.
4. Install the shelves and bins in the refrigerator and freezer
compartments.
5. The controls are preset at the factory to the midpoint setting.
Check to be sure that the compressor is operating properly
and that all the lights are working.
6. Flush the water system before use. See "Water System
Preparation."
To get the most efficient use from your new built-in refrigerator,
read your Use & Care Guide. Keep Installation Instructions and
Use & Care Guide near the built-in refrigerator for easy reference.