Drainage - Fountaine Pajot HELIA 44 Guia Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

7) Drainage

Cockpit locker:
hand pump
Open and unfold the hand pump located on the back cover
of the cockpit aft locker. A pipe stored inside must be unrolled
in order to drain the desired areas.
Electric bilge pump
The boat is equipped with 6 electric bilge pumps:
1 by engine compartment,
2 by hull.
Switch on the electrical panel: two possible positions
AUTO position (optional):
The bilge pump is triggered automatically in case of water increase
in the funds and its functioning is signaled by a sound alarm,
MANUAL position:
The bilge pump is activated manually by pressing the switch on the
electrical switchboard; put the switch in the OFF position at the end
of the drainage.
DAD_MDP_054_001—10/07/2012
NOT CONTRACTUAL DOCUMENT
32

Publicidad

Tabla de contenido
loading

Tabla de contenido