Positioning The Crank Tower - TRUSST CT-CS60 Guía De Referencia Rápida

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 8
TRUSST® QRG
Installation

Positioning the Crank Tower

1. Place the Crank Tower in the vertical position.
2. Remove the pin that holds the legs in the vertical position.
3. Lower the leg and repeat until all 4 legs unfold and the braces are horizontal.
4. Replace the pins in all 4 legs into the desired hole to lock legs in place.
5. Adjust the feet and diagonal bars to stabilize and level the Crank Tower, using the built-in bubble
level on the tower base.
· Ensure the ground is firm enough to prevent any sinking of the Crank Tower.
· The stability of the Crank Tower is of prime importance to ensure all safety and winch
features function properly.
TRUSST® recommends the placement of 3/4" thick plywood pads under the tower base and
leg feet, if using the tower on a soft surface or where damage to the flooring may be a concern.
5
EN

Publicidad

Tabla de contenido
loading

Tabla de contenido