Mounting Plastic Profiles On Posts; Assembly Of Horizontal Rails And Vertical Posts - Trigano PISCINES 123 840 B Instrucciones De Montaje Y Guía De Utilización

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 100
5.1. Without Concrete Slab
Set the ends of the trenches with breeze blocks.
5.2. With 10cm Concrete Slab
3
Recommended concrete: 150 kg of cement per m
of sand, mixed in a cement mixer.
Provide locations in readiness, by using polystyrene strips or wooden rafters of rectangular cross
section measuring 15 cm wide by 14 cm deep for the horizontal rails and setting of the ends
.
The dimensions of the slab should extend beyond the edges of the pool by at least 30 cm.

6 - Mounting plastic profiles on posts

Before starting to assemble your pool, mount the white plastic profiles on the posts (caution: for oval
pools, there are two types of posts).
7 – Assembly of horizontal rails and vertical posts
Assemble the vertical post and the horizontal rail. The open side of the vertical post should be facing
the interior of the pool.
IMPORTANT: Do not tighten the nuts until the various elements are assembled.
NOTE: The vertical poles are covered with a protective sleeve.
49 - Notice N°123 840 RevB

Publicidad

Tabla de contenido
loading

Tabla de contenido