3. Using a level and a square, make sure the
base frame is squared and leveled.
Wall panel installation / Montaje de los paneles
4 Following the numeration (same number on
the base frame and down inner side
of the panel), erect the first wall panel (panel
No.1-glass door). The panel goes tightly on both
sides of the floor frame and the panel remains in
vertical position.
5 Following the numeration on the base frame
and the panel, take the column № 1/2 and
connect it with wall panel №1 by metal plate.
Due to the "tongue and grove" profile of the
boards, the panels fit perfectly, vertically and
tightly one into the other.
3. Utilizando un nivel y escuadra, asegúrese
que la estructura base tenga el ángulo recto y
esté nivelada.
4. Siguiendo los números /el mismo número
está situado en la parte inferior del panel y en la
base/ levante el primer panel (panel 1 – puerta
de cristal). El panel se ajustará firmemente a
ambas partes de la estructura, haciendo que se
mantenga en posición vertical.
5. Siguiendo la numeración, coja la columna No.
1/2 y conéctala al panel No. 1 mediante las
placas metales. Gracias al perfil de "ranura y
lengüeta" de las placas, los paneles de pared
encajan perfecta y firmemente el uno con el
otro.
4