Steps Of Assembly - SPORTSTECH F75 Manual De Instrucciones

Ocultar thumbs Ver también para F75:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Nr
80
Red round cushion pad
81
Black round cushion pad
82
Powder metallurgy bush
83
Middle line of electronic meter
84
Upsidedown T-shaped socket
85
Lower cover of panel of
86
87
Left and right rear angle beads
Step 1:
Installation of complete machine
1. Hold the electronic meter and slowly lift it to fixed screw hole.
2. Fix electronic meter onto column with 74# screw and 84# flat gasket.
3. Fix protecting cover of column onto rear cover of electronic meter on the top of
column with 82# screw.
4. Fix column onto pedestal with 74# screw, 76# screw and 84# flat gasket.
5. Remove package stator (red) fixing frame and pedestal, and prevent the frame from
hurting people when bouncing off.
Name
Trim strip

7. STEPS OF ASSEMBLY

53
Nr
Name
88
Grip pulse + ascension / switch
89
Grip pulse + speed shortcut key
90
Flat gasket
91
Spring washer
92
Locknut
93
Silicone oil
94
Instruction
95
Dumbbell

Publicidad

Tabla de contenido
loading

Tabla de contenido