Mounting The Product - afriso FloCo-Top-1K Manual De Instrucciones

Ocultar thumbs Ver también para FloCo-Top-1K:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 80
5.3

Mounting the product

 Verify that the product is not mounted the product on top of or next to a
non-insulated boiler part, above opening dampers at furnaces or to the
flue gas pipe.
 Verify that the float housing points vertically to the top.
LEAKING PRODUCT
Verify that you use a screwed pipe connection as per DIN 2353 with cylindri-
cal thread (G thread) and seal the screwed pipe connection with a flat gasket
or with suitable glue. Do not use Teflon tape or hemp.
Failure to follow these instructions can result in equipment damage.
3. Mount the suction line into the female thread G
cylindrical screwed pipe connection G
torque is 40 ±10 Nm.
4. Use a stiffener in the case of soft or semi-soft copper pipes.
5. Lock with an open ended spanner (spanner size 24) and tighten the
screwed connection at the connection piece.
6. Mount the burner hoses. Before mounting, make sure the sealing sur-
faces are clean and not damaged. The tightening torque is 20 ±5 Nm.
Mounting
A
NOTICE
3
/
1. Mount the product to the
boiler casing using the
enclosed bracket and the
four self-tapping screws.
2. Use the bracket as a tem-
plate when screwing in the
self-tapping screws. The
arrow (A) must point
upwards.
3
of the housing with a
/
8
as per DIN 2353. The tightening
8
FloCo-Top-1K
EN
13

Publicidad

Tabla de contenido
loading

Productos relacionados para afriso FloCo-Top-1K

Tabla de contenido