Power Supply - edc Panther Guía De Instalación Y Funcionamiento

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 25
Pump installation
GB
The PANTHER pump can be installed in any convenient space inside the equipment,
trunking or voids up to 1 metre above the sensor. Typical installations are shown below.
(Fig.7) Inside the air handler. (Fig.8) In a false ceiling above the air handler. (Fig.9)
Inside trunking or false wall.
Where possible the pump should be placed on or wrapped in foam insulation
and cables and tubes should be secured to reduce vibration and noise.
Fig.7.
Wiring Connections
Connect the ground, live and neutral wire from the supply cable of the PANTHER pump
to the supply terminals (see Fig.6)
This product must be connected using a switch with contact separation in all poles that
provide full disconnection from the power supply under over-voltage categories III. A
fuse non time delay (rated 250V 1A), shall be fitted into the line, supply side (see
Fig.10).
Cable Connections
Wire Colour
1 GREEN/ YELLOW
2 BLACK
3 WHITE
4 VIOLET
5 VIOLET
Alarm Contacts
Volt Free Break On Fault connection is
rated 5 amps 1250VA. It may be
necessary to use a contactor if the air
handler supply is to be switched.
4
Fig.8.
Connect
EARTH
LIVE
NEUTRAL
Alarm contact
Alarm contact

POWER SUPPLY

Fig.9.
Symbol
E
L
N
E
L
N
CONTROL
CIRCUIT
1A
FUSE
1
2
3
4
Fig.10.
5

Publicidad

Tabla de contenido
loading

Tabla de contenido