Ingeteam
See document AAX2002IKM07 for information on system configuration in the INGECON EMS
Manager.
The following graph shows the results of a strategy implemented in the INGECON EMS Manager in a photovoltaic
generation and storage system. It can be seen that there is enough photovoltaic power available to supply
installation consumption and to charge the batteries. The latter is used during night-time hours.
PV power available
Self-consumed PV power
Grid consumption
2.2. Compliance with regulations
2.2.1. CE marking
CE marking is mandatory for the sale of any product within the European Union, without prejudice to standards or
laws. INGECON EMS Manager units have CE marking by reason of their compliance with the following directives:
•
Low Voltage Directive 2006/95/EC.
•
Electromagnetic Compatibility Directive 2004/108/EC.
28 - English
Example of energy management in a home
Battery charge
Consumption from batteries
AAX2002IKH06_A - Installation manual
Unit Description