Descargar Imprimir esta página

GRAFF LM40-VS Instrucciones De Instalación página 4

Ensamble de los manillas

Publicidad

This faucet complies with NSF61/9, ASME/ANSI A112.18.1
and CSA B 125 Standards.
Este grifo se encuentra conforme con losestandares de NSF61/9,
de ASME/ANSI A112.18.1 y de CSA B 125.
to the sink edge (you notice distinct shift of Δ angle to the required
positioning - as shown on fig. 2.4). Take the lever assembly (13) off
the valve spindle extension (7)
and move the valve spindle extension (7)
splines and screw the bolt (8) back into position - fig. 2.6. Place the
lever assembly (13) on the valve spindle extension (7)
the correct positioning of the lever (13.1) - fig. 2.7.
If the position of the lever (13.1) is proper, you may tighten the set
screw (14) using hex key (K1) according to the drawing 2.8.
However, if the position of the lever (13.1) is still incorrect, move the
valve spindle extension (7) one more tooth on valve head splines and
check the lever (13.1) positioning once again.
6. After installation of the hot water valve (6L) and the lever assembly
(13), repeat the above mentioned steps for installing the cold water
valve (6R) .
(12)
(16)
(
6L
)
( )
( )
5
(
6L
)
(
6R
)
IOG 2805.80
– see fig. 2.5. Loose the bolt (8)
one tooth on valve head
and check
(17)
(
6R
)
( )
5
5
1
5
ENSAMBLE DE LOS MANILLAS
Installation Instructions Ž
&
5.
( & &
&
( 3
" 0 4 &
/
(
(
& 7
" 8
(
&
!
5
4 & 9 &
(17)
( )
( )
5
(
6L
( )
5
(
6L
)
(
6R
)
4
6L
15
16
17
4
HANDLES ASSEMBLY
Instrucciones de Instalación
&
(
" 1
&
" .
/
& (
! &
/
& (
!
" 5 6
& (
! &
&
&
#
&
&
/
& (
! &
(
&
&
(12)
)
(
6R
)
( )
( )
( )
( )
6R
15
16
17
5
Rev. 1 July 2011
&
(
2
&
! &
" 1
&
& &
.
CAÑO
(16)
1
2
3
4
5

Publicidad

loading