PLEASE READ THESE INSTRUCTIONS CARE-
FULLY BEFORE INSTALLATION
Info
"Flexa Twin" shower enclosures are available in the following
models: ELT10 - ELT11 and ST2l. For further information regard-
ing the functions for each separate model, please see the price
list and main catalogue.
Flexa Twin is formed of elements that are dispatched in three
packages:
• hydromassage tub and transparent roof
(the roof is optional in version ST2)
• fitted-out wall and wall with mirror
• glass panes (a fixed one and a sliding one), with guides
and profiles
IMPORTANT: check that the goods are intact on
arrival, so that any claim made to the forwarding
agent will be prompt.
It can only be installed in a corner, with a finished (tiled) wall hav-
ing no skirting board.
For maintenance operations, it will be necessary to remove the
front panel of the tub and/or shower enclosure inspection panel:
so a free space of at least 50 cm must be left in order to facilitate
work (
1a
).
It is important to make sure that the preparations
that have been made comply with the indications
given in the pre-installation sheet.
Preparation of water and power connections
For a correct operation of the apparatus, it is necessary to ensure
the required flow rate and pressure of the hot and cold water (see
the table with the technical specifications and dimensions).
You must provide a single pair of wall outlets for hot and cold water
(copper pipe, Ø 14 mm): they must protrude and end with a down-
ward 90° elbow (1/2" M) (
to the flexible pipes coming from the mixer tap assembly (in a
model with single-control mixer tap) or from the filter (in a model
with thermostatic mixer tap).
The drain on the floor (or on the wall, flush with the floor) must be
placed at the correct distance from the drain hole of the tub,
depending on the siphon to be fitted (not supplied) (
If you wish to connect an ELT model to an alarm circuit, you will
need to provide the necessary connection.
Models equipped with a telephone require the preparation of a
chase in the wall or an external channel for the passage of the
supplied telephone cable. This cable is already connected inside
the "telephone box" (see electric diagram) and a length of
approx. 10 metres should be left for connection to the telephone
socket to be provided by the Customer.
Provision must be made also for the connection of the electric
box (which is fastened to the framework of the tub: see
). These outlets will be connected
2
the electric network and to the earth system. The cable may be
routed in several ways, provided there are no loose junctions: see
the "Electric safety" chapter.
Installation of tub
Remove the roof from the package containing the tub, and set it
aside temporarily.
Place the tub in the position provided, and make sure that it is
perfectly horizontal and at a height of 57 cm from the floor, by
operating all the feet (central ones and external ones:
details 1 and 2
Mark the position of one hole for each foot on the floor, shift the
tub, bore the floor, and insert the screw anchors provided (
detail 2
).
Check the perpendicularity of the walls, in order to ensure a cor-
rect assembly of the parts. The compensators fitted at the ends of
the glass panes can compensate for up to 5 mm. If there is a con-
siderable perpendicularity error in the walls, you can correct it by
means of spacers made of wood or other materials, moving the
tub away from the wall, if necessary (
Before you begin the assembly operations, make
sure that the tub is in working order, and check it for
leakage, particularly in points that cannot be
reached by only removing the front panel.
Installation of fitted-out wall
Move the tub away from the corner as much as you need to be
able to work easily.
Apply a small amount of silicone around the holes, as shown
in
.
5
Open the package that contains the walls, set the wall with mirror
aside, and take the fitted-out wall.
The package contains a little bag with all the
screws you will need for assembly.
Position the fitted-out wall so as to cause the holes on its frame-
work to coincide with the holes on the tub (
From under the tub edge, mount the screws and washers, with-
2
).
out tightening them completely (
Connect the waterfall pipe to the pipe fitting on the tub (
Connect the flexible pipe coming from the mixer tap assembly to
the pipe fitting of the filling tap (
Using a metal band, connect the silicone pipe of the boiler outlet
to the fitting that is already connected to the tub drain
detail 1.
Connect pipe (A) of the steam outlet in the tub (
2
) to
to the other pipe fitting on the tub rim (detail 2).
11
).
4
6, details 1 and 2
).
8
3,
3,
).
).
6, details 1 and 2
).
).
7
9,
, detail 3)
9