Before You Start
1
Prior to installing inspect the bathtub for damages. Place the bathtub back into the packaging or
cover with a drop cloth to prevent damage during the rest of the construction.
TOTO® Cast Iron Bathtubs are designed for a variety of installations depending on the model
selected. Follow only the installation instructions for your particular model/installation.
Provide properly dimensioned framing.
Adequately level the sub-floor for proper support of the bathtub.
Ensure proper access to the final plumbing locations.
All TOTO® Cast Iron Bathtubs are ASME Standard A112.19.1 compliant.
Site Preparation (new installation)
2
Proper floor support must be provided. Review the product specification sheet for load require-
ments.
WARNING: Do not support the bathtub by the rim. Provide adequate support under the
!
bathtub feet.
Ensure the flooring has adequate support for the bathtub. Verify the sub-floor is level and flat.
Construct 2 x 4 or 2 x 6 stud framing. Allow for the thickness of the finished wall.
Verify the water supply location according to the specification sheet. Cap supply lines and check
for leaks.
Suggested Framing for Bathtub Installation
3
Position the
rough
plumbing.
Construct 2 x
4 or 2 x 6 stud
framing
Provide a 1/16" (2
mm) gap between
the bathtub rim
and the framing.
Suggested for FBY1500, FBY1510, FBY1550,
FBY1700 and FBY1800 models.
Install Drain
4
WARNING: Do not lift or move the bathtub without assistance. A cast iron bathtub is extremely
!
heavy and may cause personal injury.
WARNING: Do not support the bathtub by the rim. Provide adequate support under the bath-
!
tub feet.
Install the bathtub drain according to the manufacturer's instructions.
Place a drop cloth inside the bathtub to provide surface protection during installation.
Frame the floor.
Verify the sub-floor offers
adequate support and is
flat and level.
Deck Installation
Installation
Position the
rough
plumbing.
Verify the sub-floor offers
adequate support and is
flat and level.
Suggested for FBY1515, FBY1525 and FBY1715
models.
Construct 2 x 4
or 2 x 6 stud
framing
Alcove Installation