Operation; Automatic Operation Sequence - GE 6030A Manual De Instalación Y Puesta En Marcha

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Operation

automatic operation sequence

The generator's control panel houses a logic control circuit
board. This control board constantly monitors utility power
source voltage. Should that voltage drop below a preset
level, control board action will signal the engine to crank
and start.
When utility source voltage is restored above a preset
voltage level, the engine is signaled to shut down.
The actual system operation is not adjustable and is
sequenced by sensors and timers on the control board,
as follows:
utility Voltage Dropout sensor
• This sensor monitors utility source voltage.
• If utility source voltage drops below about 70 percent
of the nominal supply voltage, the sensor energizes
a 10 second timer. The timer is used to 'sense'
brown-outs.
• Once the timer has expired, the engine will crank
and start.
34
utility Voltage Pickup sensor
This sensor monitors utility power supply voltage. When that
voltage is restored above 80 percent of the nominal source
voltage, a time delay starts timing and the engine will go to
engine cool-down.
engine cool-down timer
• When the load is transferred back to the utility power
source, the engine cool-down timer starts timing.
• The timer will run for about one minute, then the
generator will stop.
• Minimum engine run time is 5 minutes.

Publicidad

Tabla de contenido
loading

Tabla de contenido