2.
Installation sequence
– Pinch off the corner at top left of the cladding cut-out – Fig. 30.
– If the flue connection is at the top, punch out the cut-out on the cladding at top left – Fig. 31. If the flue
connection is at the rear, do not punch out.
Fig. 30
Pinch o the corner of the cladding
at top le
CAUTION
– Carefully insert the cladding at top left and secure it with 6 self-tapping screws – Fig. 33.
Fig. 32
Position cladding carefully at top le
– Hook cladding into place at front, left, and right (3 bayonet locks) – Fig. 34. Secure with 3 self-tapping screws –
Fig. 35.
Fig. 34
Insert front cladding
Punch out cladding = top flue connection
Do not punch out cladding = bottom flue connection
Insert or position the cladding at top left carefully, to ensure that the integral fuel hop-
per is not scratched at the front – Fig. 32.
Fig. 31
Punch out cut-out only if ue connec-
tion is at top
Fig. 33
Secure cladding with 6 self-tapping
screws
Fig. 35
Secure front cladding with screws
21
EN
6 x
3 x