Sperian Miller RA15-1 Manual De Instrucciones Para El Usuario página 15

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
Don the full-body harness.
Install roof anchor.
Connect lifeline to roof anchor D-ring using the carabiner.
1. Twist carabiner gate to unlock.
Ensure that carabiner completely closes and locks.
Attach rope grab to lifeline.
Fig. 7
1
2. Unscrew the locking thumbscrew to open the device.
toward the lifeline anchor point.
downward; it will not lock onto the lifeline should a fall occur.
4. Close the device around the lifeline, tighten thumbscrew, and
6. To reposition the rope grab on the lifeline, lift upward on the spring-loaded cam
handle that connects the gripping cams. Slide the rope grab to the desired
position on the lifeline and release the cam handle. The spring-loaded gripping
cams will keep the rope grab in position.
Connect lanyard between rope grab and harness back D-ring.
Shock absorber pack snap hook must be connected to harness back D-ring; the lanyard leg
snap hook connects to the rope grab. Ensure that both snap hooks completely close and lock.
Us er In stru ctio ns - Engli sh
all straps to fall in place. If chest and/or leg straps are
buckled, release straps by unbuckling at this time.
2. Slip straps over shoulders so D-ring is located in
middle of back between shoulder blades.
end. Repeat with second leg strap.
below the sternum. Tighten to keep shoulder straps
taut.
2
3
Fig. 6
1
2
5

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Miller ra20-1Miller ra30-1Miller ra35-1

Tabla de contenido