Whale Bilge IC BP2082B Manual Del Usuario página 8

Ocultar thumbs Ver también para Bilge IC BP2082B:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 42
Purpose of Fuse: The purpose of this fuse is to protect the pump from serious damage in the
event of system blockages, therefore please ensure all valves are fully open before operating the
pump.
If the fuse blows:
a) Check that all system valves/stop cocks are open
b) Check that the inlet and outlet ports are not blocked
c) Check that the rest of the system is not blocked
d) Check for reverse polarity connection
11.vii Connect Switching Cable
If switching cable must be fitted through bulkhead, ensure a minimum hole diameter 25mm (1") is
drilled.
11.viii Connecting Gulper IC to Strainer IC (See Fig 1)
Connect the pre-wired Deutsch
connectors on Gulper® IC and
Whale Strainer IC (Fig 9).
12. PLUMBING
Fig 10. Secure Pipework
13. INSTRUCTIONS FOR USE
Ensure that pump installation is thoroughly tested before first use.
NOTE - These are all automatic or semi-automatic applications -
ensure that isolator switch is turned on.
Bilge application
Gulper® IC with Strainer IC - Place finger over sensor area to
check pump is activated, remove finger and wait for the pump to
stop (45 seconds).
Fig 8. Connecting Switching Cable Through Bulkhead
Fig 9. Connect Deutsch Connectors
Use 19mm (¾") or 25mm (1") smooth bore reinforced
pipework to connect to the pump.
Secure the pipework on inlet and outlet with worm drive
hose clip (Fig 10).
Hole diameter
25mm (1")
minimum
Fig 11. Testing Strainer IC
8

Publicidad

Tabla de contenido
loading

Tabla de contenido