Mounting
1.
Select a suitable flat location on the bulkhead and cut out a circular hole diameter
140mm (5½").
2.
Place pump through hole and push into position. Either pushing up or down depending
on mounting orientation (see fig 4a and b).
3.
Ensure that the mounting wedge is fully engaged with the bulkhead.
4.
Open handle and mark the position of the 4 fixing screw holes on the bulkhead
(see fig.5). Note – The pump must be installed using 4 screws.
Fig.5 View Of Mounting
Positions
(Ommiting The Handle)
5.
Remove pump and drill 4 holes at these marked positions. See table below for
recommended screw holes and sizes:
6.
Place pump in position and attach to bulkhead using 4 self tapping screws.
Mounting wedge
Ensure pushed fully in
this direction
Fig 4a Handle down position
Screw
Holes
Pilot Drill Hole
Diameter 3.5 mm
Fig.3 Recommended
Fig.4 Mounting Pump
Fig 4b Handle position
Fig.6
Self-tapping Screw
Diameter 5 mm
Mounting Positions
With Wedge
Handle
Hinge
Holding
Screws