ssembly :
Preparation:
• Place the base on the floor and remove the
water tank.
Install pole in main unit:
• Insert pole 1 and 2 according to the diagram
to the right, ensuring the marks on the unit
and the poles line up.
• Press pole firmly into place.
Locking the pole :
• With the poles inserted lay the base on its
side.
• Turn the 2 lockbars on the base of the stea-
mer 90° to secure the poles.
Use a coin or similar object to turn the lock-
bar.
• fter the poles are locked, pick up the unit
and return to its use position.
Installing Integrated Hanger :
• Take the hanger with the brush hooks facing
to the front.
• Check for correct orientation with the index
marks matching.
• Insert both ends of the hanger into the pole
connection and press both ends simulta-
neously into the pole until the hanger pro-
perly engages.
• If it is required to dismantle the pole from the
main unit, tilt the appliance and unlock the
pole first.
• Then place the appliance back into it's upright
position. Expand both poles to the desired
height by unlocking them, pulling them
gently and locking them. Warning : Unlock
the four clips while keeping integrated han-
ger in your hand.
• Dismantling of the hanger from the poles by
the customer is not foreseen.
ttaching Steam hose to the main
unit :
1) Insert hose plug into hose connector on
main unit.
2) Secure hose connector by pulling clamping
ring upwards.
1
5
Pole 1
Pole 2
2
CLIC