Refco YUMA Guía De Instalación Y Funcionamiento página 5

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 22
Wiring Connections
GB
Connect the ground, live and neutral wire from the supply cable of the YUMA pump to
the supply terminals (see Fig.6)
This product must be connected using a switch with contact separation in all poles that
provide full disconnection from the power supply under over-voltage categories III. A
fuse non time delay (rated 250V 1A), shall be fitted into the line, supply side (see Fig.5).
Cable Connections
Wire Colour
1 GREEN/ YELLOW
2 BLACK
3 WHITE
4 VIOLET
5 VIOLET
Alarm Contacts
Volt Free Break On Fault connection
is rated 5 amps 1250VA. It may be
necessary to use a contactor if the air
handler supply is to be switched.
Testing
Before testing, ensure that the collection tray and drain hose is free of dirt and debris.
Pour clean tap water into the collection tray until the pump starts. Pump operation may
be noisy initially until any air has been purged from the system.
Continue to add water and the pump should switch to full power and the alarm contacts
should open. Do not continue to add water if it becomes visible in the breather tube.
Allow the YUMA to clear the water. The pump should switch off and the alarm relay
should reset.
4
Connect
Symbol
EARTH
E
LIVE
L
NEUTRAL
N
Alarm contact
Alarm contact
POWER SUPPLY
E
L
N
CONTROL
CIRCUIT
1A
FUSE
1
2
3
4
Fig.5.
5

Publicidad

Tabla de contenido
loading

Tabla de contenido