Hayward Saline C Manual Del Usuario página 19

Ocultar thumbs Ver también para Saline C:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 25
Plumbing The System
Saline C systems require a minimum of 9 m
/h of flow through the electrolytic cell housing to achieve the rated production of chlorine. The system can
3
be plumbed with the full flow of the circulation system flowing through the cell housing or a bypass can be created to achieve 9 m
/h of flow through the
3
cell housing. In either case the cell housing must be installed as the last component in the return to the pool, after all other equipment. The vessel has 4
mounting holes for attaching to a floor or mounting surface. See the plumbing diagrams below.
SALINE C 6.0 System Plumbing
Saline C
Power Supply
Chemical
Controller
Acid Feed
Saline C
Tank
Electrolytic Cell
Saline C
Flow Sensor
Heating
Return Line
System
Bypass Manifold Plumbing
Saline C
Saline C
Power Supply
Electrolytic Cell
Chemical
Controller
Acid Feed
Tank
Saline C
Flow Sensor
Return Line
Heating
System
USE ONLY GENUINE REPLACEMENT PARTS
Page 7 of 11
Rev. C
Saline C

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Hcsc60eu

Tabla de contenido