Testing of the entire system where the control unit is installed must be
performed by qualified personnel who must conduct all tests according to the
associated risks.
BEFORE
POWERING UP
THE AUTOMATION
- check all connections
- set all trimmers to minimum
- set all dip switches as required
- set the adjustment trimmer to minimum power
On completion of the above, the unit can be started up.
POWERING UP
- ensure correct operation of all inputs
- adjust the motor output to ensure compliance with current standards
by means of the relative trimmer
- ensure correct direction of motor rotation
- set the work and pause trimmers
- perform the final operation test
MAINTENANCE / DISPOSAL
In the event of malfunctions, ensure exclusively qualified personnel perform
repairs, maintenance or adjustments.
Dispose of all materials in compliance with current regulations.