Installation Requirements - Wolf EC24B Guia De Instalacion

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

SPECIFICATIONS

Installation Requirements

The coffee system can be installed in a standard or flush
inset application. The sides of the cabinetry opening must
be adequate to support installation of the mounting slides.
Finish the edges of the opening. They may be visible when
the door is open.
For standard installations, face trim will overlap stiles and
rails. Refer to the chart below.
For flush inset installations, a minimum
required on all sides. To ensure consistent reveals, each
corner of the opening must be exactly 90°.
The Wolf coffee system is designed and agency approved
for installation with Wolf built-in ovens, microwaves and
warming drawers only.
If a coffee system is installed above a cup warming drawer,
one opening for both units must be specified.
INSTALLATION REQUIREMENTS
BASE SUPPORT
Coffee System
TRIM OVERLAP
Top
Bottom
Sides
|
4
Wolf Customer Care 800.222.7820
Electrical
Installation must comply with all applicable electrical codes.
Locate the electrical supply as shown in the illustrations
on the following pages. A separate circuit, servicing only
this appliance is required. A ground fault circuit interrupter
(GFCI) is not recommended and may cause interruption of
operation.
1
/
"
reveal is
(3)
8
MIN
100 lb
(45 kg)
3
/
"
(5)
16
0"
(0)
11
/
"
(18)
16
Rating plate location.
ELECTRICAL REQUIREMENTS
Electrical Supply
Service
Receptacle
Power Cord
RATING PLATE
grounded, 120 VAC, 60 Hz
15 amp dedicated circuit
3-prong grounding-type
6'
(1.8 m)

Publicidad

Tabla de contenido
loading

Tabla de contenido