Descargar Imprimir esta página

Installation Instructions - Thermon Terminator ZP-L-XP Instrucciones De Instalación

Kits conexion de alimentacion

Publicidad

Installation Instructions

1.
Locate bus connection (HPT and FP only) and cable as shown.
Cut end of cable at angle to aid in piercing grommet. Leave
additional cable for expansion loop. See page 4 for multiple
cable installation tips.
2.
Insert cable into expediter. If mounted on bottom or side of
pipe, punch out weep hole.
3.
Slide expediter toward pipe and route cable through support
base entry.
4.
Insert banding guide into expediter and snap into place.
5.
Mount expediter to pipe using pipe band. Do not band over
cable.
6.
Cut off end of cable.
7.
Terminate cable with appropriate PETK termination kit.
Refer to PETK installation instructions.
8.
Push excess cable back through expediter. Tighten cap
securely. Tape cable expansion loop to pipe.
2

Publicidad

loading

Este manual también es adecuado para:

Terminator zp-s-xp