Monogram ZWL1126SJ Instrucciones De Instalación página 7

Ocultar thumbs Ver también para ZWL1126SJ:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

24" Flush Mount Deflector Vent
2. Install deflector as shown in Figures
10 and 11
Shelf detail showing the deflector vent during
installation. Position deflector vent and mark holes.
Pre drill using a 1/16" bit before mounting.
Figure 10
Shelf detail showing the deflector vent installed.
Figure 11
3. Place the drawer adjacent to the wall or cabinet.
Plug the power supply cord into the electrical outlet.
4. Carefully guide the drawer into the prepared
opening. Avoid contact with the sides of the cutout
opening and also pinching the cord between the
oven and the wall.
5. Slide the drawer all the way back until the
mounting flanges touch the cleats in the cabinet
opening.
Installation Instructions
7
6. Open the drawer. Using the 4 holes on the
drawer as a template, pre drill the cabinet using a
1/16" bit. See Figure 12.
Figure 12
7. Secure the drawer with the 4 screws supplied.
Mounting
Flange

Publicidad

Tabla de contenido
loading

Tabla de contenido