MoJack XT Lift
Operating Instructions
Some steps of the Operating Instructions are repeated from the
Assembly Instructions. The Operating Instructions will show a full
working cycle of the MoJack XT.
Before using the MoJack XT, carefully read this manual in its entirety.
10
Operating Instructions
Preparing the MoJack XT for Use (Steps 1 - 8)
STEP 1
Unfolding MoJack XT
• Pull and rotate Tower Locking Pin 90 degrees to the
unlocked position.
• Raise the Tower by pulling up on the Grip Handle. Once the
Tower is in the vertical position, lift up on the Grip Handle and
drop the Tower into the Base.
• Lock the Tower into place by rotating Tower Locking Pin until
the pull ring retracts into the locking slot.
Tower Locking Pin
(unlocked position)
STEP 2
Installing Lift Arm
• Hang the Lift Arm on the Carrier by hooking the slotted area
of the lift Arm under the top bar of the Carrier. Lift Arm must
be inserted from the front and then lowered which fastens
Lift Arm into place.
• Secure Lift Arm to Carrier with Clevis Pin and Small Hair Pin.
Top Bar of Carrier
Lift Arm
Carrier
MoJack XT Lift
Tower
Locking Pin
(locked position)
Tower Locking Pin
(locked position)
Carrier
Small Hair Pin
11
Top Bar
Clevis Pin hole
Clevis Pin