Water Worker G-5 Manuel Del Propietario E Instrucciones De Instalación página 6

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

7. Insert piercing pin and gasket into
saddle valve. NOTE: For best pin
piercing, position point to pierce the
center of the pipe.
10. Use appropriate supporting tube
straps and hangers to hold tank
into position.
13. Open faucet to evacuate air from
plumbing system.
8. Hold assembly up to piping, ensure
that there is no interference with the
wall, ceiling, or other appliances.
11. Turn water supply main valve on
and check for leaks.
14. Turn water heater back to desired
temperature setting.
9. Tighten saddle valve in place
by turning two (2) Allen screws.
Alternate between the two (2) screws
every one (1) revolution.
12. Re-check air pressure with tire
gauge. If higher than 80 psi, a
pressure reducing valve must be
installed. (See trouble shooting.)

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

G-5lG-12G-12l

Tabla de contenido