Water Worker G-5 Manuel Del Propietario E Instrucciones De Instalación página 7

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

TROUBLE SHOOTING
If the tell-tale signs of thermal expansion return, the water heater safety
tank should be examined to determine if the tank is operating properly.
Any Questions?
Call
1-800-521-9210
DO NOT ADJUST the pre-charge or re-pressure this Product except for any adjustments required at the time of initial
installation especially if Product is corroded, dmaged or with diminished integrity. Adjustments to pre-charge must be
done at ambient temperature only.
1. To check for excessive line pressure,
open a faucet near the water heater
for approximately one (1) minute.
4. To check tank pre-charge pressure,
shut off water suply main valve.
Typical "Completed" Installation
2. Remove air stem cap and measure
pressure in the tank. If pressure
is greater than 80 psi, a pressure
reducing valve is required.
5. Relieve system pressure by opening
a faucet near the water heater.
3. Install a pressure reducing valve
to reduce pressure to an approved,
acceptable level, (below 80 psi).
6. Measure pressure in the tank. The
tank pressure must equal 40 psi (± 5
psi)static city cupply pressure.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

G-5lG-12G-12l

Tabla de contenido