Preparing Your Work Piece - General E-Z Pro 851 Manual De Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

PREPARING YOUR WORK PIECE

Marking the pieces: Lay the 2 pieces to be
joined on a flat surface and mark the drill hole
locations across each board (Fig. E). This will be
the INSIDE of the joint.
For the edge doweled part:
1. Mark the board and select the appropriate
bushing following the edge doweling
instructions (1) and (2) on page 5.
2. Set the appropriate collar depth for edge
drilling (2").
3. Drill your edge holes as in Steps 3 & 4 on
page 6. (Fig. C)
For the surface doweled part:
1. Move the drill bushing to the corresponding
location on the top of the E•Z Pro Deluxe
Doweling Jig Kit. (Fig. G)
2. Secure your work piece accordingly; clamp
the jig with the appropriate "V" pointer on the
location line. (Fig. H)
3. Set your corresponding collar depth (1-1/2")
and drill holes for each dowel position. Insert
dowels and assemble dry to check for fit.
Apply glue to dowel pins or drilled holes for a
permanent joint. Once assembled, wipe away
excess glue.
7
E
F
G
H

Publicidad

Tabla de contenido
loading

Productos relacionados para General E-Z Pro 851

Este manual también es adecuado para:

E-z pro 841

Tabla de contenido