Internal Repeater Installation Toro Network Ltc Plus Satellite Plastic Pedestal - Toro Turf Guard Manual De Instalación Y Configuración

Sistema inalámbrico de monitorización del suelo
Ocultar thumbs Ver también para Turf Guard:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Internal Repeater Installation - Toro Network LTC Plus Satellite - Plastic Pedestal
To complete this installation, you will need an internal repeater, a power supply board (to plug into the LTC
Plus 13 VAC power supply) and a 1/4" (6.4mm) #20 x 5/8" (15.9mm) socket head cap screw.
Step 1
Turn the power source OFF
to the Network LTC Plus
satellite controller and
remove the front plastic
door.
Step 2
Mount the repeater on the
inside wall of the pedestal
(on either side) using a
1/4" (6.4mm) #20 x 5/8"
(15.9mm) socket head cap
screw.
Step 3
Mount the power conversion
board on the inside of
the satellite opposite the
repeater using the adhesive
back. See Figure 13.
Step 4
Connect the power supply
board (TG PS) to the power
source. See Figure 14.
Step 5
Connect the power
conversion board to the
repeater using the power
connector cable.
Step 6
Turn the power source back
ON to the satellite.
Step 7
Record the repeater ID and
location in the Installation
Log.
Step 8
Proceed to the Internal
Repeater Startup Procedure
section.
Figure 13
Figure 14
Power Supply Board
(TG-PS)
To Circuit Board
To Power Cable
Repeater
7

Publicidad

Tabla de contenido
loading

Tabla de contenido