Operating Instructions
STEP 18
Raise Carrier
• Raise the Carrier by turning the Crank Handle
clockwise until the Carrier Locking Handle
drops into the top Tower Hole.
STEP 19
Rotate Crank Handle to Storage position
• Push in side of handle and rotate from operating position to
the storage position. Allow to seat into the locked position.
MoJack EZ Max Lift
Top Tower Hole
18
STEP 20
Moving the Tower Assembly to Storage position
• Remove Hair Pin and Clevis Pin from bottom of Tower Assembly.
• Raise the Tower out of the Base by pulling up on the Lift Handle.
• Rotate Tower Assembly 180 degrees and lower into storage position.
• Secure the Tower by inserting Clevis Pin and Hair Pin to lock
Tower Assembly in storage position.
Carrier
Locking
Handle
THE MOJACK EZ MAX IS NOW READY FOR STORAGE OR TRANSPORT.
MoJack EZ Max Lift
Operating Instructions
Clevis Pin
Clevis Pin
19
Tower Assembly
Hair Pin
Hair Pin