CONDITIONS PREREQUISITE TO INSTALLATION
- The area 100 cm around the pool must be cleared.
- Paving must be firmly fixed to the ground and laid on a concrete apron with a cement content of 350 kg/m
During installation, and regularly during use, check that the pads protecting the coping are correctly
positioned, that is underneath the bars where they are in contact with the coping.
Should additional protective pads be required to guarantee protection of the cover, these must be put in
1
Place the rolled-up cover along the width of the pool to be
covered (on the side opposite the stairs or roman stairs, if
any) .
This side of the pool will be called the "storage side"
3
Couverture
cover
"Storage" side
Côté "stockage"
50 cm
B
A
20 cm
On the deck, mark the position of the first 5 pegs with
bushing (3 for the straps and 2 for the cables) according to
the diagram above. Dimensions indicated are measured
from inside the pool.
A = peg position for attachment of bar tension straps.
B = peg position for attachment of cable tension straps.
INSTALLING THE COVER
:
position before using the cover.
T
HE STRAPS MAY BE SLID FREELY ALONG THE BARS DURING INSTALLATION
TO ENSURE PERFECT ALIGNMENT WITH THE PEGS ON THE DECK
cover
A
pool axis
axe du bassin
IMPORTANT
2
Centre the cover correctly with respect to the pool.
From the opposite side, pull on the central strap to
completely unroll the cover.
Center the cover on the coping.
If a separate element for lateral steps has already been
fitted, the cover will rest on the profile replacing the coping
when the cover is unrolled.
4
A
B
20 cm
Drill holes for the Ø 8 mm pegs with bushing:
- Ø 12 mm - depth 70 mm
Insert a Ø 8mm peg with bushing in each hole and drive home
using a mallet.
17/48
2006/11 - Version: I - Code : 0033860
.
3