UPPER BUNK ASSEMBLY
Ø4 mm x 35 mm Screw
(14 used in this step)
⑨
13. Lay out the Upper Mattress Support Slats (S) between the wood stoppers on the Ladder Side Rail (M)
and the Upper Mattress Side Rail (N). Insert and screw 35 mm Screws (9) into the countersunk holes on
each slat. Tighten the screws using a Phillips screwdriver.
12