OLEO ELEVATOR LB 50 Serie Guia De Instalacion página 4

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 22
LB 50-65
SWITCH ASSEMBLY FITTING INSTRUCTIONS
NOTE: Buffer must be fully extended before switch is set up.
The switch is supplied in a plastic bag, which is taped to the side of the expansion tank. As switches are fragile these should
be fitted as late as possible in the installation process and certainly after all other heavy equipment is installed in the pit area.
Follow below steps to install:
1
3
5
7
9
Lever lightly
Lever lightly
touching
touching
push rod
switch plunger
3
Cap and washer
before fitting
Washer removed
and discarded
Bracket assembly
in place over
threaded spigot
Push lever
forward to touch
push rod
10
With switch positioned and
held in place as fig. 9 remove
backing from adhesive tape,
press sub plate firmly up to
bracket with 2 screws
protruding through
Fit two washers and nuts to
secure switch
2
Plastic cap
removed and
discarded
4
Position bracket
assembly in
Fit nut securely
to guide, apply
thread lock
6
(eg. Loctite
242/243) tighten
nut to 10 Nm
(8 ft/lbs)
Square up
bracket as shown
8
11
Washer
and nut
position
Position switch
and screws
Switch assembly
fitted correctly

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Elevator lb 65 serieElevator lb 55 serieElevator lb 60 serie

Tabla de contenido