Installation - POBEL 710 710 Manual De Instrucciones

Ocultar thumbs Ver también para 710 710:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

ENG

1.4.INSTALLATION

According to the photos, make the installation following these steps:
1. Join the level with the boiling body using the GL -25 thread.
2. Connect the gray hose to the water supply of the equipment. The other end of the hose, with the filter
previously installed, will be connected to a ¾" tap..
3. Make sure that the seals (JV1 and JV2) are placed in the vertical tube, introduce the refrigerant vertically
downwards.
4. Screw the GL-18 nut connecting the level inlet with the upper outlet or coolant outlet.
Ed. 06
COMMUNICATION BETWEEN LEVEL AND BOILER
JV1
JV2
15

Hide quick links:

Publicidad

Tabla de contenido
loading

Tabla de contenido