Product Instructions
Viega GeoFusion
Fittings
®
EN
Viega GeoFusion Fittings
Viega products are designed to be
installed by licensed and trained plumbing
and mechanical professionals who are
familiar with Viega products and their installation.
Installation by non-professionals may void
Viega LLC's warranty.
UV Resistance: Viega GeoFusion fittings
are produced using a minimum of 2%
carbon black, a material used to protect
PE products from the effects of UV radiation. Viega
GeoFusion fittings can be used in exposed, above
ground applications for indefinite periods of time and
do not require protection from UV exposure during
shipping, handling, storage, installation or use.
Shipping, Handling And Storage Instructions
Prior to installation Viega GeoFusion fittings should
be stored in the original packaging in a clean, dry
location.
Viega GeoFusion fittings shall be installed
and tested in accordance with industry
accepted and approved procedures per
applicable code requirements.
Fittings Suitable for Direct Burial
The following model numbers are suitable for direct
burial: V9016, V9016.2, V9016.3, V9018, V9018.2,
V9056, V9015, and V9040.
Fittings Not Suitable for Direct Burial
The following model numbers are NOT suitable for
direct burial (accessible location only): V9016.5,
V9016.4, V9018.8, V9018.5, V9018.6, V9018.7,
V9011, V9015.3, V9015.4, V9049, and V9013.1.
Accessible is defined as being installed in
a manner that provides open access or
may require the removal of access door or
panel, e.g., fittings installed in a mechanical room or
installed in a mechanical box within the ground.
Viega LLC
585 Interlocken Blvd.
Broomfield, CO 80021
Phone (800) 976-9819
www.viega.us
Fitting Installation Instructions
1
Attach the correct socket faces, which are in good
condition, to the heating body of the tool.
2
Connect tool to an adequate power supply (120
volts A.C.)
3
Heat faces between 500 and 525 degrees F.
Adjust temperature as necessary.
4
Square pipe ends with a pipe cutter designed for
plastic pipe.
5
Wipe pipe end and fitting clean with a damp cloth.
6
Insert pipe end into the properly-sized depth
gauge and attach the proper sized cold ring onto
the pipe.
7
Begin timing the "heat cycle" as soon as the pipe
and fitting are properly positioned on the pre-
heated socket faces.
8
At The Conclusion Of The "Heating Cycle", Snap
The Pipe And Fitting From The Tool.
9
Within Three Seconds, Push The Pipe And Fitting
Together Squarely Without Twisting.
10
Hold Firmly Together For The Specified "Holding
Time".
11
Wipe Hot socket faces clean with a clean, dry,
non-abrasive cotton cloth.
12
Visually inspect each fusion joint.
EN
Product Instructions
Viega GeoFusion Fittings
This document is subject to updates. For the most current Viega
technical literature please visit www.viega.us.
ES
Instrucciones del Producto
Accesorios Viega GeoFusion
Este documento está sujeto a actualizaciones. Para consultar la más
reciente literatura técnica de Viega visitar www.viega.mx.
FR
Directives du Produit
Raccords GeoFusionMD Viega
Ce document est soumis à des mises à jour. Pour consulter les
manuels techniques Viega les plus récents, consultez notre site
www.viega.ca.
PI-HC 589093 1119 GeoFusion Fittings (EN ES FR)
HDPE Fusion Cycle Time
It is important to follow and understand the
instructions that come with your socket fusion tool.
The integrity of your system will depend on how well
the fitting connections are made. It is very important
that the heating and handling times be followed.
Each tool manufacturer will provide charts outlining
heating and handling times. In the absence of a
manufacturers chart the table below can be used as
a guide.
HDPE Fusion Cycle Holding Time Chart
Heating
Holding
Size
Cycle
Time
(in)
(seconds)
(seconds)
¾ IPS
8-10
30
1 IPS
10-14
30
1¼ IPS
12-15
30
1½ IPS
15-18
40
2 IPS
18-22
40
Curing Time
Before
Handling
(minutes)
20
20
20
20
30