fortress V Serie Instrucciones De Instalación página 14

Ocultar thumbs Ver también para V Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Note:
• Only one screw per bracket is needed to secure the
bracket to the panel.
• Screws should be installed on the same side of brackets.
Fig. 1
Step 4:
Cable Tensioning
• Reference pages 35 & 36 for Cable Tensioning steps.
Step 5:
Attach I-Support To Deck
1. Fasten I-Support to deck surface with the supplied Phillips
Head Wood Screw. As shown in Fig. 1 below.
Note:
• Pre-drill with a 1/16" [2mm] drill bit.
Fig. 1
14
V-SERIES: VERTICAL CABLE INSTALLATION

Publicidad

Tabla de contenido
loading

Tabla de contenido