Installation - Built In Construction
Operation
1
Fastening the Upper Baffle & Lower Baffle
Use 10 Screws (DD) to fasten the Upper Baffle (B) & Lower Baffle (D) to the Fireplace (C).
2
Steps 2 to 5 describe optional installation for
removing the power cord and changing to hard wired
Remove the pre-attached Screw holding
the junction box cover.
Loosen the three screws holding the wires and
remove the Negative, Live and Ground wires.
A474
Junction Box Cover
13
Terminals
Loosen the 3 screws
www.tsicustomerservice.com