Troubleshooting - Sputnik Engineering MaxVisio Documentación Del Dispositivo

El panel de visualización para sus inversores
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

5. Then plug the MaxVisio power supply unit into a 230 V
6. In the MaxVisio menu Settings – Software, select the option "Operating mode
2" and wait until the device is ready again.
7. Select Settings - Device installation. Press "Start" and wait until all devices
have been found. When the last set address has been reached, exit the menu
by pressing the
key.
8. After a maximum of 30 seconds, the current system data should appear in the
MaxVisio display.
230 V
230 V
/ 12 V
AC
AC
DC
V+, GND
MaxVisio
V+, GND, A, B

3.3 Troubleshooting

If MaxVisio does not work as expected, please check the following:
Symptom
No display.
Incorrect connection of the
power supply unit.
No data are
Incorrect connection of the
displayed or no
connection cable.
devices are found.
The device search
The devices are not
does not fi nd all
addressed correctly, or are
devices.
switched off.
27
socket.
AC
SolarMax C
SolarMax C
SolarMax C
RJ-45
RJ-45
Wiring for operating mode 2
Possible cause
Action
Disconnect MaxVisio
immediately from the power
supply and check the wiring
of the plug-in power supply
and the connection cable on
the terminal.
Check the wiring of data ca-
bles A and B on the terminal.
Check the addresses of all
devices in the network. Each
address may only be used
once. The addresses must
be between 1 and 50.
RJ-45
en
28