Suzuki DL250L8 Instrucciones Para El Montaje página 3

Juego de cubiertas de articulación
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

1. Removal
Installation
1. Move the clutch cable boot.
2. Loosen the bolt of balancer
several turns and pull the bal-
ancer assembly out of the han-
dlebars. (LH and RH)
NOTE: Loosen
3. Remove the lever pivot bolt and
nut. (LH and RH)
NOTE: Disuse the removed lever
4. Loosen the clutch cable adjuster
nut and disconnect the clutch
cable.
5. Remove the clutch cable boot
from the clutch cable.
NOTE: Disuse the removed boot.
6. Assemble the clutch cable boot
(10) to the clutch cable.
the
bolt
enough to remove the bal-
ancer. Otherwise, the bal-
ancer may disassemble
and
some
components
may remain in the handle-
bar.
pivot bolt.
Clutch cable boot
only
Clutch cable
boot
GENUINE SUZUKI ACCESSORIES
3/6
Balancer
Bolt
Clutch cable
Lever
pivot bolt
Nut
Clutch cable
boot (10)

Publicidad

Tabla de contenido
loading

Tabla de contenido