Installation
1. The fire is designed to be permanently fixed to o woll ot a minimum height of 300
mm. The wall bracket must be fitted horizontally and the cable routed to the bottom
right of the fire. A height of 600 mm from the Aoor to the bottom of the wall fire is
recommended for optimum viewing of the fuel bed.
2. Use the bracket as a table template and mark five drill positions on the wall. Ensure
that these holes are all level.
3. Put the bracket aside and drill
holes with a depth 35 mm
using a 2 mm pilot drill bit &
8 mm drill bit.
4. Clean the holes from dust and
debris and insert one plug
in each hole. Make sure the
edge of each hole is Aush
with the surface.
5. Hold the bracket in position
and fix it in place with screws.
6. Carefully lilt the appliance
up, ensuring that the top rear
ledge of wall fire engages
with the wall bracket and is
sitting centrally. This process
should be carried out by two
people to avoid injury or
damage to property or the
appliance.
7.
Do not let go of the appliance until you are sure it is safely attached to the bracket.
Gently bring the wall fire down against the wall. Mark the lower fixing brackets two
fixing hole positions on the wall, then remove the wall fire.
8. Drill the wall and insert the wall plugs.
9. Refit the wall fire to the wall and fasten the bottom fixing bracket to the wall using
the screws provided to permanently fix the wall fire in place.
10. Remove the front panel and unpack the logs from the bag and place them along the
light unit in the desired position.
1 1. Put the front panel back in place.
EN
21