General Instructions - T&S B-0502 La Instalación Y Las Instrucciones De Mantenimiento

Ocultar thumbs Ver también para B-0502:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

General Instructions

Installation:
1. Shut off water supply and drain lines.
2. Drill (two) holes for ½" NPT (National Pipe Threads) inlets and (one) ½"
NPT outlets for connections coming from wall. (See drilling dimensions for
hole.)
inlet
floor
3. Mount assembly to floor with two no.3's, allowing 4" [10 cm] or more
from back of unit to wall. Install two (2) inlets (hot and cold sides) and one
(1) outlet.
4. Apply teflon tape or pipe joint compound to threads of supply lines. Con-
nect supply lines with ½" NPT piping.
5. Turn on water and check for leaks.
Note: It is strongly recommented that each supply line be equipped with a
hammer arrester installed per manufacturer's instructions. A typical installa-
tion is shown:
insert
no.3
floor
Note: To order replacement parts, order the B-50-P parts kit.
(For repair of no.7)
outlet
1"
1.207
2.414
wall
4"
out
[10 cm]
in
4
1-15/16
Note: Piping and
hammer arrester
supplied by others.
hammer arrester

Publicidad

Tabla de contenido
loading

Tabla de contenido