Spring Start-Up - Champion MARQUIS WC 35 Manual Del Usario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

NOTE: The chain hooks
supplied
with
this
mounting kit are for use
in wood. Additional an-
chors can be purchased at
your local hardware store
for anchoring in other
types of materials such as
concrete or brick.
• Install window panel
retainers. Place two
panel retainer strips onto
bottom of neck flange and
position to the width of
the window. Cut the
strips to fit if necessary.
These strips hold the win-
dow fill-in panels (Fig. 4).
• Position cooler in win-
dow. Position neck of
cooler so that bottom of
neck flange rests on win-
dow sill and flange (E-Fig.
3) is snug against edge of
sill (H-Fig. 2). With cooler
in position, hook the "S"
hooks into the holes of the top pan near the back of the cooler (B-
Fig. 3).
• Break fill-in panels to fit. With cooler installed, as described
above, measure for each window fill-in panel and score with sharp
knife and straight edge guide to desired width. To break window
fill-in panels, the panel should be laid over the edge of a straight flat
surface at the point to be broken off. Apply pressure on the edge of
the panel that extends over the edge of the surface and break off
unwanted piece.
• Install fill-in panels. Place one window fill-in panel on each side
of grill and into panel retainer strip at bottom of grill. Place the
other panel retainer strips onto top of neck flange and fill-in panels.
Be sure the panels are snug up against cooler neck.
• Place window behind retainer strip. Raise back of cooler so that
the window (D-Fig. 3) may be brought down behind top of panel
retainer strip (C-Fig. 3).
• Level Cooler. Adjust the chains to level the cooler.
• Adjust house legs. Pull out house legs so that the rubber bumpers
rest against house siding (F-Fig. 3). Tighten screw in retaining
collar. (G-Fig. 3).
Connecting Water
• Install overflow assembly. Remove nut and place nipple through
the hole in the pan, with the rubber washer between the pan and the
head of the drain nipple (Fig. 5).
Screw on nut and draw up tight
against bottom of pan. Insert over-
flow pipe in nipple to retain water.
Overflow pipe may be removed to
drain pan when necessary. A garden
hose may be screwed on the drain
nipple to drain water away from
your unit.
110496-1
A
"S" Hook
D
C
Window
Neck
H
E
F G
Fig. 3
Window Fill-In
Panels
Top Panel
Retainer
Bottom Panel
Retainer
Fig. 4
Overflow Pipe
Nipple
Rubber Washer
Bottom Pan
Nut
Fig. 5
• Connect water supply line. Install a sillcock and water valve on
faucet as shown by figure 6. Place the nut and ferrule on the tubing
and tighten the nut until water tight.
• Install float valve. Install valve in the provided hole in corner post
B
(Fig. 7) and attach water supply line.
• Fill pan. Allow water to fill to within 1" of top of pan and adjust
float to maintain this water level. This can be accomplished by
bending the float rod (Fig. 7).
Faucet
Sillcock
Fig. 6
WARNING:
off and unit is unplugged. This is for your safety.

Spring Start-Up

• Oil bearings. The blower bearings and cooler motor in this unit
should be oiled with a few drops of non-detergent 20/30 weight oil
once each year. The motor does not need oil if it has no oil lines for
oiling. Motors that have no oil lines are lifetime oiled at the factory
and require no further oiling for the life of the unit.
CAUTION:
out, due to excessive oil getting
into motor winding.
• Check belt tension. A 3 lb.
force should deflect the belt 3/
4 inches (see Fig. 8). Readjust
belt if needed.
• Clean pump. Cleaning the pump is necessary once a year at start-
up. For your safety, turn unit off and unplug from power receptacle.
Remove the pump from the mount slot. Remove the base of the
pump as shown in Fig. 9. Clean the pump and turn the impeller to
ensure free operation. Remove the pump spout and check for any
blockage. After cleaning,
reinstall the base onto the
pump. Reattach the pump
to the mount in the cooler
using the plastic retainer to
ensure that the pump will
not overturn. Do not for-
get to replace the spout and
water delivery tube onto
the pump outlet.
• Change Pads. Aspen pads should be replaced once or twice a
season, depending upon the length of the season. At the beginning
and at mid season a clean pad is more absorbent and efficient and
will deliver substantially more cool air.
Water Supply
Corner Post
Float Rod
Maintenance
Before doing any maintenance be sure power is
Do not over oil. Over oiling can cause motor burn
Depress Here To
Remove
Line
Fig. 7
3 Lb.
3/4 Inches
Fig. 8
Fig. 9
3

Publicidad

Tabla de contenido
loading

Tabla de contenido