The priority levels are as follows:
In the same way, as there are three programmes available (PROG 1, PROG 2 AND PROG3)
the timeframes could overlap too. Where there is a timeframe overlap, certain priorities are
established in order to determine the programme that will be activated.
The priority levels are as follows:
Therefore, if you have the following programmes:
• PROG1 for day 1
• PROG1 for days 1 to 5
• PROG1 for days 1 to 7
With the above priorities applicable, as individual day's programmes have priority over
programmes for groups of days, on day 1 only the programmes set up for that day are
activated whilst the remaining are ignored. On days 2 to 5, as the programme for groups of
days has priority over the full week, the former will be activated. And on days 6 and 7 of the
week the programmes set for the full week will be activated.
In order to see the priorities set for PROG1 over PROG2 and this over PROG3, please see
the following example:
As PROG3 is the one
with least priority, a
maintained temperature
of 19.5ºC is set from
4
00:00 to 23:59
hours.
As PROG2 has priority
over
PROG3,
temperature of 21.0ºC is
set from 06:00 to 21:30.
4
If the program ends at 23:59h and there is another starting at 00:00h, the program will continue till 00:00h,
i.e., the AC Unit would not stop for 1 minute.
60
All manuals and user guides at all-guides.com
Highest Priority
Individual Days
Working Days or Weekends
Lowest Priority
Full Week
Table 2 – Day priorities
Highest Priority
Lowest Priority
Table 2 – Programme priorities
a
PROG1
PROG2
PROG3