Descargar Imprimir esta página

Raychem E-100-A Instrucciones De Instalación página 4

Publicidad

Idiomas disponibles

Idiomas disponibles

4
E-100-A Installation Instructions
5
• Pull heating cable back through
bottom of end seal stand until braid
is just visible above strain relief. Use
cable lubricant if needed.
7
• Install cap; tighten until the slot on the cap and the slot on
the stand align.
8
• Fasten end seal to pipe with strap.
Do not pinch heating cable.
• Install cable tie.
• Loop and tape extra heating cable to pipe.
• Apply insulation and cladding.
• Weather-seal the stand entry.
• Fasten end seal label to insulation.
• Leave these installation
instructions with the user
for future reference.
Braid
Strain
relief
Cable tie
Pipe strap
6
CAUTION: Health
Hazard. Wash hands
after contact with
sealant. Consult mate-
rial safety data sheet
VEN0033.
• Push boot onto the end
of the heating cable until
it bottoms out.
Note: For 1 in (25 mm)
and smaller pipes use
adapter (purchased
separately) between
stand and pipe.
Trim
JBS-SPA
adapter for
small pipes
Glass cloth tape
Position
adapter
this side
up.

Publicidad

loading

Productos relacionados para Raychem E-100-A