Descargar Imprimir esta página

Raychem E-100-A Instrucciones De Instalación página 5

Publicidad

Idiomas disponibles

Idiomas disponibles

E-100-A Re-entry Instructions
A
WARNING: Shock Hazard.
Conductors will be exposed.
Re-entry should only be
performed by qualified
personnel. Follow standard
electrical lockout procedures
before opening end seal.
• Turn off power.
• Clip cable tie and remove.
C
CAUTION: Health Hazard.
Wash hands after contact with
sealant. Consult material safety
data sheet VEN0033.
• Grab black ring and
remove boot.
E
• Inspect boot. If boot is damaged or sealant appears dry or
missing, replace boot. For replacement boots, order kit E-100-
BOOT-5/PACK. Otherwise, re-install boot.
E-100-A Installation Instructions
B
• Unscrew cap from end seal stand.
D
• Test as required.
• Refer to Industrial Heat-Tracing
Installation and Maintenance Manual
(H57274) for test procedures.
F
• Install cap; tighten until the slot on the
cap and the slot on the stand align.
5
• Install new
cable tie.
Trim

Publicidad

loading

Productos relacionados para Raychem E-100-A