Preparing For Operation - Chauvet Professional Atmos Guía De Referencia Rápida

Ocultar thumbs Ver también para Atmos:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Atmos™ QRG
Control Panel
Description
Preparing for
Operation
Button
<FUNCTION>
Enters the programming mode
<VOLUME>
Controls the pump to modify the output volume
<TIMER>
Starts the timer controlled operation
Allows momentary fog output for as long as the button is
<MANUAL>
held down
Navigates upward through the menu list or increases the
<UP>
numeric value when in a function
Navigates downward through the menu list or decreases the
<DOWN>
numeric value when in a function
To prepare the Atmos™ for operation:
1. Pull out the fluid tank and remove the cap.
2. Verify that the two plastic hoses attached to the cap are in place and in good
condition.
3. Pour Chauvet (HDF or QDF) fluid inside the tank and re-cap.
4. Reinsert the tank.
5. Make sure that the plastic hose that goes from the cap to the Atmos™ is not
bent.
6. Plug in power and wait approximately 8 minutes for warm-up to complete.
Function
4
EN

Publicidad

Tabla de contenido
loading

Tabla de contenido