Descargar Imprimir esta página

GE GPF375 Instrucciones De Instalación página 4

Juego de panel de acceso y puerta personalizado de 3/4 de pulg. (19 mm) del lavavajillas

Publicidad

Idiomas disponibles

Idiomas disponibles

4 INSTALL GPF100 SPRING KIT
This kit must be installed to achieve proper
door balance which is affected by the addi-
tion of a heavy custom door panel.
• Follow the instructions provided with the
GPF100 kit.
5 INSTALL CUSTOM PANEL TO
ACCESS ASSEMBLY
• Drill 3 holes 3/16" dia. into the access panel
as shown.
• Place the custom panel onto the access
assembly and mark hole locations.
• Drill 3 holes, 1/8" dia. holes, 5/8" deep into
the custom panel.
• Align the custom panel with screw holes
and drive 3 screws into the back side of the
assembly panel and through the custom
panel. The top edges should align evenly.
CAUTION:
Do not drill pilot holes too deeply to avoid
damaging the appearance side of the panel.
1/2" to 2"
1/2" to 2"
3/16" Dia.
Three Places
1/2" to 2"
Pub. No. 31-30522
1/2" to 2"
Center Line
ESPECIFICACIONES SUJETAS A CAMBIO SIN PREVIO AVISO
6 INSTALL ACCESS PANEL
ASSEMBLY AND TOEKICK
• Place the toekick against the bottom of the
dishwasher.
• Place the access panel assembly against the
dishwasher and tighten the attached
screws.
• Re-install two original bottom screws
loosely. Adjust the toekick up or down and
tighten screws.
Escutcheon
Escutcheon
Loosen 2 Screws
Tighten 2 Screws
Access Panel
Access Panel
Door
Door
Panel
Panel
Toekick
Toekick
DWG. NO. 206C1559P062
(ND 923-15) 2/04

Publicidad

loading