PLANT!T aeros iv master Manual De Usuario página 4

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

9
From the top, push the Master Delivery
Assembly through the 20mm hole in the
Master Lid, and connect to the pump.
Position the Master Lid with Assembly
and Pump on the Master Tank, ensuring
the pump plug is outside with the cable
resting in one of the grooves, and the
shaped handles over the grooves, though
do not press down to fit at this stage.
11
Push the Master Lid over to one
side, so you can part fill the system
– water will flow into the 4 Planter
Tanks from the Master Tank. To
check all the seals are watertight,
plug the Water Pump in (socket
should be off the floor for safety)
to test water is circulating properly
around the system – you may need
to lift the Mesh Pots from position
to ensure flow from each delivery
tube – the water level throughout
should remain constant. You may
also at this point wish to plug in the
Air-Pumps to test that bubbles flow
from every Air-stone. Once you are
happy the system is functioning
correctly, press the Master Lid down
to fit.
5cm
10
Position one of the thin lengths
of delivery tube from the Master
Delivery Assembly, in the nearest
groove on the rim of each Planter
Tank, so the open end is at least
5cm over the Tank, and this time
press the Planter Lid down to fit,
holding the tube in place.
fill level
Young Plant
Established Plant

Publicidad

Tabla de contenido
loading

Productos relacionados para PLANT!T aeros iv master

Tabla de contenido