Sprayhead, IR Module and Thermostatic Mixing Valve Installation

A
Install hemmed end (not sharp end) of
support tube with gasket onto bowl.
Place sprayhead with 3/8" tubing onto
B
support tube. Run the tubing down through
the support tube. Make sure the spray holes
point away from the wall.
Place the upper tie bar (notched at both
corners of each end) on top of sprayhead
parallel to wall. Connect the two threaded
tie rods together using the coupling nut
with hex head set screws. Run the tie rod
C
down through upper tie bar and secure
from underneath the bowl using the lower
tie bar (no notches) and hex nut with socket
head set screw. A minimum of 2-1/4" of
threaded tie rod should protrude below the
lower tie bar; this will be required to attach
the valving.
IR Module Assembly
(S50-367)
Tie Bar
Tie Rod
(176-008A)
Support Tube
(S57-006)
Support
Tube Gasket
(125-011)
Valve
Assembly
Pedestal Assembly (S17-287)
10
Tie Rod Pre-Pack
(S45-1336)
Top Cover
(107-099 (A))
(107-179 (O))
Module Cover
(S04-083)
Sprayhead
(S05-054B)
1/15/2013
Place the infrared module assembly on top of
sprayhead. Rotate until infrared module locks in
D
with tie bar. Drop two infrared module wires down
to valve assembly. Make sure infrared module
windows are facing away from the wall.
Skip to step F for units without soap.
For units with soap option, install the spacer, soap
dispenser and cover using the couping nut, third
E
tie rod (8-5/8" long) and second coupling nut.
Secure with sprayhead restraining bracket, acorn
nut and socket head screw.
F
Secure infrared module cover and top cover with
acorn nut and socket head set screw.
Holding the valve assembly outside of pedestal,
G
connect 3/8" tubing from sprayhead to valve
assembly tube connector. Connect the two flexible
hoses to the valve assembly.
Thread one supplied 3/8" nut onto the tie rod.
Slide valve assembly on next and secure with
another 3/8" nut. Connect flexible hoses to supply
H
stops. Make sure the hot supply is connected to
the hot inlet on the valve (marked with the letter
"H") and the cold supply is connected to the cold
inlet on the valve (marked with the letter "C").
Infrared
Module
Assembly
Coupling
Nut and Set
Screw
Sprayhead
Drain
(269-1597)
Supply Tube
Terreon
Semi-Circular
®
Deep Bowl (ADA Bowl
Shown, Classic Bowl is
Optional)
(Part No. Varies with
color of bowl. Contact
your local Bradley Rep
for assistance)
A/O Units
Access Panel
(A Shown)
(186-1260)
Bradley • 215-1332 Rev. V; ECN 12-00-004
Installation
Tie Rod Pre-Pack
Cover
Tie Bar
Tie Rod
Section View of
A/O Unit Assembly