Confirm Proper Operation; Operating Sequence - Kohler K-1109 Guia De Instalacion

Ocultar thumbs Ver también para K-1109:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Fill with water 2" (5cm)
above the highest jet
Turn the jet trim
ring clockwise to
decrease the flow

10. Confirm Proper Operation

Fill the Whirlpool
NOTE: Please read these steps carefully before you operate your whirlpool.
- Position the jet nozzles so they face down toward the basin. Turn the jet trim rings fully counterclockwise.
- Fill the whirlpool to a water level at least 2" (5cm) above the top of the highest jet.
NOTE: The water temperature in the whirlpool should not exceed 104_F (40_C).

Operating Sequence

- Press the air actuator to turn on the whirlpool jets.
- Adjust each jet for optimum flow. Turn the trim ring clockwise to reduce the flow, and counterclockwise to
increase the flow.
- Press the air actuator a second time to turn off the whirlpool.
NOTE: Whirlpool will operate until it is turned off by pressing the air actuator.
C
1010997-2-
Position the jet
nozzles to direct
the water flow as
desired
Turn the jet trim ring
counterclockwise to
increase the flow
Press the air actuator to turn on and
off the whirlpool
10
Kohler Co.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K-1357

Tabla de contenido